How a run works.

One run, one ticket. Autonomous where it’s safe, stopped at your door where it isn’t — and it never merges.

Anatomy of a run

Six places a run can stop, and five of them are yours.

The six steps of a Switchboard run and which of them stop for a human
StepWhat happensStops for you
01 · Ticket picked upWhat happensRead from GitHub, Jira, a workbook or a CSV — full context, comments and all. You choose exactly which fields the agent sees.Stops for you—
02 · Readiness triageWhat happensFails Definition-of-Ready? It goes back to the reporter as needs-info with the exact gaps, and the run ends there — successfully. Ready? It proceeds.Stops for youGate
03 · Process declared, then enforcedWhat happensThe run declares which disciplines your repo prescribes. The first file write is blocked until each one has been invoked.Stops for youGate
04 · Work on an isolated branchWhat happensFeature branch or worktree, per your repo’s conventions. Main is never touched. Stalls, context saturation and quota stops are caught, not recorded as success.Stops for you—
05 · Plans, commands, writes, questionsWhat happensEach pauses the run until a human answers. If the supervisor is unreachable, the agent is blocked — never waved through.Stops for youGate
06 · Pull request & merge approvalWhat happensA pull request opens with effort, outcome, cost and root cause written back to the ticket. A claimed PR is checked against the real repo — a fabricated one is flagged, not filed as done. Merging is a human decision, every time.Stops for youGate

Market data: developers use AI in roughly 60% of their work, but report being able to fully delegate only 0–20% of tasks — Anthropic, 2026 Agentic Coding Trends Report

See it on a real run

One ticket, start to finish. Every figure read off the audit.

REV‑198 → PR #347, 54 minutes, two operator gates. Quoted from the session’s own export — 3,399 events, nothing inferred.

  • 54 minTicket → merged PR
  • 230Tool calls
  • 7Subagents
  • 9Skills invoked
  • 2Human “yes” gates
  • 3,399Audited events
  1. Switchboard · session audit · 15 Sep 2026

    From flaky ticket to merged PR in fifty-four minutes

    REV-198 → PR #347, squash-merged to main as eca10b0. 230 tool calls, 7 subagents, 9 skills — and two points where a human said yes.

  2. The ask · Jira REV-198

    Three tests failed once each, then passed on re-run at the identical tree.

    CI is disabled, so local runs are the only evidence there is. Scope was fixed by the ticket: test files only, no production code.

  3. Gate 1 · human decision · 02:02 → 02:34

    The run stopped and asked a human before writing any code.

    It put the whole diagnosis in front of the operator in plain language — one paragraph per test, naming the exact file and line, the fix, and what it deliberately would not do. It also flagged the limit of its own work: these fixes cannot stop an outside writer touching the shared database.

    Operator answeredApprove — implement exactly this triage and plan

  4. Build · test-first · 04:14 → 18:40

    Every fix was proven by breaking it first.

  5. Review · three agents, in parallel · 19:51

    Three reviewers ran at once, and two of them converged on the same residual flake.

    The flood test could pass with fetch_count at zero — a 401-before-JWKS path never reaches the endpoint. It gained the floor assertion its own docstring already claimed.

  6. Finding 01 · deviation from acceptance criterion 1

    The ticket’s own acceptance criterion could not pass.

    The prescribed watermark — created_at >= clock_timestamp() — was implemented verbatim and failed. The run measured why rather than tuning it green: created_at carries the transaction’s transaction_timestamp(), landing 0.04–2.05s before the PATCH. It excludes the row it selects.

  7. Finding 02 · found, proven, deliberately not fixed

    A test-only ticket surfaced a real production bug.

    Impact is low: rotation runs from a single scheduled job, and the reader takes ORDER BY created_at DESC LIMIT 1.

  8. Finding 03 · the panel corrected itself · 42:14

    A reviewer retracted its own claim before it reached main.

    In round one it asserted a mechanism — that a FOR UPDATE lock serialized the two concurrent rotations — and a docstring was written to match. In round two, the same reviewer found that claim was wrong.

  9. Verification · read off the final tree · 44:00

    Twenty of twenty iterations green. 2,145 passed, zero failed.

  10. Gate 2 · merge approval · 51:56 → 52:25

    The merge request named the two things the operator should weigh before deciding.

    Operator answeredMerge #347 into main (squash, delete the branch)

  11. Shipped · 14:49:29 UTC

    eca10b0 is on main. Four files, +106 / −33, no production code.

    Branches deleted, local main fast-forwarded, working tree clean. REV-198 closed Done with all five stage sub-tasks. Five items were left open on purpose — each written into the pull request rather than carried in someone’s head.